Renovating your bathroom: the steps and the budget to plan for

13 May 20267 min readBathroom

Before choosing the tiles, there are the drains, the water supply, the waterproofing and the order of the work. Here is how a renovation goes and what makes the budget vary.

Renovating a bathroom is often the project people keep putting off. You have to do without the room for a while, coordinate several trades and get an idea of the budget. Yet a well prepared renovation goes much more smoothly than you might think. Here are the steps, in order, and what makes the price vary.

Take stock before drawing anything

Before choosing a walk-in shower or a vanity unit, you need to look at what is behind the walls and under the floor. In many older Brussels houses, the pipes have been altered several times over the decades. You still find lead or galvanised steel pipes, drains with too little fall, makeshift fittings.

  • Where is the soil stack, and can the toilet or shower be moved without difficulty?
  • Is the water supply in good condition, or does it need redoing?
  • Will your hot water supply be enough if you switch from a bath to a large shower, or the other way round?
  • Is the room properly ventilated, with a window or an extractor fan?
  • Will the floor take the weight of a full bath or thick tiles?

These answers determine what is possible and what will cost more. Moving a toilet, for example, is rarely straightforward because of the drain.

The steps of a renovation

  • Removing the sanitary fittings and stripping out the existing finishes.
  • Redoing the plumbing: supply, drains, new outlets according to the chosen layout.
  • Electrics if needed, following the specific rules for wet rooms.
  • Preparing the surfaces and waterproofing, especially in the shower area.
  • Tiling or other finishes.
  • Fitting the sanitary ware, taps and furniture.
  • Sealing, finishing, commissioning and checking for leaks.

The order matters. Sloppy waterproofing under beautiful tiles comes back to haunt you a few years later, often at the neighbour's below. It is the step you should never cut corners on.

The technician's tipTake photos of the walls and floor before the tiles go on, with the pipes visible. The day you want to put up a shelf or do a repair, you will know exactly where the pipes run.

What makes the budget vary

It is impossible to give a serious price for a bathroom without seeing it. Two rooms of the same size can need very different work. The main factors are the following.

  • The condition of the existing plumbing and whether it all needs redoing.
  • Moving water points and drains.
  • The type of shower: a walk-in shower takes more work than a standard shower tray.
  • The choice of sanitary ware, taps and tiles, where price differences are huge.
  • Access: a fourth-floor flat with no lift makes removing rubble and deliveries harder.

We draw up a detailed offer after a visit, item by item, so you know what you are paying for. Depending on the size of the project, this offer may be charged, and we tell you before we come. The amount announced is then the one on the invoice, unless you decide along the way to change the project, in which case the change is priced and approved with you before it is done.

Repairing rather than redoing everything

Not everything needs a full renovation. A toilet that runs all the time, a dripping mixer, a blackened shower seal, a smelly trap or a flush to replace can be sorted in one visit. These repairs are charged at 60 € per hour, with a call-out fee of 50 € in Brussels and 60 € in the surrounding area.

A bathroom project or a repair to do? Call Chauffanet on 0488 80 07 20 or send us a few photos on WhatsApp. We answer within two minutes, and the price is always announced before the job.

Want an opinion on your installation?

A technician picks up within 2 minutes. The price is always given before any job.

CallWhatsApp